List of previous projects undertaken within the last 3 years
Popondetta Town supply (Water PNG)
2x 8” bores both bores drilled to 120 metres.
Girua Airport Water Bores (Popondetta)
2x 8” bores both bores drilled to 60 metres.
NBPOL Higaturu (Popondetta)
10x 6” bores between 60 and 100 metres
Sonoma Adventist College (Kokopo)
1x 6” bore drilled to 140 metres
Bells Transport (Kokopo)
1x 6” bore drilled to 120 metres
K Central Bakery (Kokopo)
1x 6” bore drilled to 60 metres
Lae Town Supply (Water PNG)
1 x 10” bore drilled to 30 metres
Henganofi Station Town Supply
1 x 6” bore drilled to 50 metres
Mt. Hagen Town Supply
( Waterpng)
2 x 8” bores drilled to 50 metres
Kainantu Town Supply
( Waterpng)
2 x 8” bores drilled to 120 metres
Namatanai Town Supply
( Waterpng)
2 x 8” bores drilled to 50 metres
C.P.L. Kokopo Gunanur # 1
2 x 6” bores drilled to 150 metres